Skip to content

Spot is cheap until it isn't.

Interruptible capacity discounts about 40%. What it costs you back is half a checkpoint window plus a reload, every time the pod goes away. This works out which side wins for your run.

Spot GPU planning assumptions

What the calculator assumes

The model assumes one interruption per 12 hours of runtime and a spot rate 40% below the entered on-demand rate. These are planning assumptions, not measured interruption probabilities or a provider quote. It estimates lost work as half a checkpoint interval plus restart time per interruption.

Worked example

For a 48-hour run, a 30-minute checkpoint interval and a 10-minute restart imply four assumed interruptions and about 1.67 hours of rework. With a fictional on-demand rate of $3 per hour, the model compares $144 on demand with about $89.40 on spot. Your actual discount, failures and time to finish may differ.

Before using interruptible capacity

Test that checkpoints resume correctly and estimate restart time from your workload. A hard deadline, long recovery or missing checkpoints can make a nominal discount unhelpful. The result is a scenario to evaluate, not an availability or savings guarantee.

Compare total GPU workload costs · Audit a RunPod invoice